焊接专机的机械系统主要由床身机构、工装夹具及工件辅助支撑机构、焊枪微调机构、焊接工件或者焊枪移动机构等构成。下面山东焊接专机厂家分享一下焊接专机的安装调试事项。
The mechanical system of the special welding machine is mainly composed of the machine body mechanism, tooling fixture and workpiece auxiliary support mechanism, welding gun trimming mechanism, welding workpiece or welding gun moving mechanism, etc. Next, Shandong welding machine manufacturer will share the installation and commissioning of the welding machine.
1、设备终验收合格后保修12个月,在质保期期间,将提供各种技术服务。
1. The equipment shall be guaranteed for 12 months after final acceptance. During the warranty period, various technical services will be provided free of charge.
2、供方将建立详细用户档案,在质保期期满后,依然提供广泛而优惠的技术支持,以及技术咨询和备品备件的供应,费用双方协商确定。
2. The Supplier will establish detailed user files, and after the expiration of the warranty period, it will still provide extensive and preferential technical support, as well as technical consultation and supply of spare parts. The cost will be determined by both parties through consultation.
3、供方将派出技术,负责设备在业主现场所在地的设备安装、调试以及试运行,确保用户人员能正确使用以及试运行,生产出合格产品。
3. The Supplier will send technical experts to be responsible for the installation, commissioning and trial operation of the equipment at the Owner's site, so as to ensure that the user's personnel can correctly use and test run the equipment and produce qualified products.
4、供方在需方完成现场安装、调试以及试运行后,将对用户有关技术、操作、维修人员进行系统技术培训。
4. After the Demander completes on-site installation, commissioning and trial operation, the Supplier will provide free technical training for users' relevant technical, operation and maintenance personnel.
山东焊接专机
安装注意事项
Installation precautions
1、整机应可靠接地。
1. The whole machine shall be reliably grounded.
2、安装时注意升降、伸缩行程开关触发动作可靠。
2. During installation, pay attention to the reliable triggering action of lifting and retracting travel switches.
3、横臂安装完成后,应先手动推动横臂来回试车,确保手动推时不费力方可(如果费力调整偏心轮的加紧力度)。
3. After the installation of the cross arm is completed, the cross arm shall be manually pushed back and forth for test run to ensure that the manual pushing is effortless (if it is difficult to adjust the tightening force of the eccentric).
4、横臂调试完成后安装横臂电机减速机,调整齿轮与齿条的啮合间隙,调整后固定即可。
4. After the commissioning of the cross arm is completed, install the cross arm motor reducer, adjust the meshing clearance between the gear and the rack, and fix it after adjustment.
5、在安装链条与横臂平衡块之间联接时,须在横臂升位,平衡铁与底座保持一定间隙,横臂放限位时,平衡铁与顶板之间保持一定间隙。
5. When installing the connection between the chain and the cross arm balance block, the cross arm must be lifted to the position, the balance iron and the base must maintain a certain clearance, and when the cross arm is placed to the limit, the balance iron and the top plate must maintain a certain clearance.
焊接专机的四点安装调试事项就讲解到这里了,您对此有什么需求可以随时来我们网站http://www.tayfsk.com进行咨询!
This is the end of the four point installation and debugging of the welding machine. If you have any needs, you can come to our website at any time http://www.tayfsk.com Consult!